Performed
Works
Shiprepair
- “Antartic Sea” (Factory fishing vessel of krill flour that was converted in our shipyard into a factory fishing vessel of krill flour and krill oil (Norwegian)).
The conversion, that reached 180 ton total weight of new steel, included the following outstanding ítems:
a) Construction of:
• four new tanks for the new production process, located in the afterward zone of the existing hold;
• new dewatering room for the new production process, located on the new main deck beside the existing accommodation;
• new trawl workshop room on the existing main deck;
• new main deck for substituting the previous one between the existing accommodation and the new trawl workshop;
• new control room for the new production process;
• new platform at starboard side forward of existing hold.
b) Fabrication and assembling of:
• 300 meters of new steam pipe inside process rooms;
• 260 meters of new hydraulic pipe for operation of main deck new equipment: cranes and winches.
c) Assembling of:
• new hydraulic equipment on main deck: three cranes and six winches;
• two pumps and two new tanks inside the cofferdam in way of the existing accommodation;
• new equipment inside the dewatering room for the new production process: centrifugal separator, screw distributor, ducts, pipes and three new air compressors
- “TSHD Reynaert ” (Trailing suction hopper dredge (Belgian)).
Dredge general maintenance including the following outstanding ítems:
a) hopper steel renewal;
b) tailshaft generator maintenance;
c) several electric motors maintenance, including the bow thruster electric motor;
d) bow thruster propeller blades repair;
e) sheave bronze bushes renewal of the cranes and of the several manoeuvering arrengements of the dredging system;
f) provision crane general overhauling;
g) general disassembling and maintenance of the three generator diesel engines, including: cylinder heads with their valves and valve seats, pistons, connecting rods, liners, oil filters;
h) disassembling and maintenance of the three gear boxes clutches;
i) dredging pump rotor machining;
j) disassembling of hopper water overflow device, steel renewal and central hydraulic cylinder replacement;
k) dredging pipe miscelaneous jobs:
• individual pipes disassembling;
• fabrication, welding and following machining of their pad eyes;
• renewal of washing pipe shaped parts;
• disassembling of its universal joint elbows to fill up with electric welding and to machine "in situ" their faces and holes arms;
• interior surface filling up of universal joint elbow with hard electrode and with a specific geometrical filling up design, in order to minimize the abrasive wear;
• machining of all the holes of the universal joint eight sided structure.
l) engine and pump room pipes renewal;
m) two rudder blades disassembling, bush housings "in situ" machining and new bushes machining and assembling.
- “Hang Jun 3001” (Trailing suction hopper dredge (Chinese))
Renewal of the pipe rods (8" nominal diameter, schedule 80, approximately 14 meters length) of the 16 hopper valves, assembled between the hydraulic actuator and the disc.
The renewal process for each rod included: to disassemble the actuator-rod set and transport it to the workshop; to substitute, at the workshop, the existing rod by the new one, employing the required cutting, positioning and welding; to perform, at the dredge, steel repairs in the disc actuator guides; to transport the actuator-new rod set to the dredge and assemble it on its corresponding position; to weld the new rod to its disc; final operation and watertightness tests.
- “HANG JUN 4011” (Chinese trailing suction hopper dredge) - Dismounting, fabrication/repair and mounting of dredging piping system parts (800 mm. diameter) in pump room and on main deck, including: a) cylindric pipes; b) elbows; c) conic pipes; d)tees; e) external doubler plates for straight pipes.
- “ISKATEL 2” (Italian support vessel) - Four impellers (four diesel powered pumps) installation for the new vessel dynamic positioning system: a) hull cutting and welding of eight hull flanges for pump pipes; b) manoeuvering and positioning of base-pump sets; c) pipes installation; d) mounting and welding of the base structures to the hull; e) mounting of diesel engines on such bases and alignment with the pumps; f) installation of cooling and exhaust pipes.
- “HANG JUN 3001” (Chinese trailing suction hopper dredge) - Important repair that included jobs of very different type. The following jobs are those which must be enphasized: a) “A” frame fabrication and installation; b) two service frames fabrication and installation; c) hull and main deck steel renewal; d) dredging pumps overhaul; e) dredging pipes repair; f) hopper bottom doors maintenance; g) tailshafts (2) dismounting; CPP propellers (2) full disassembling; spare parts calibration, machining and fabrication; CPP propellers assembling and testing; tailshafts mounting.
-
"SKANDI PATAGONIA". Overhauling of its two azimuthal stern thrusters, including for each unit: upper transmission box dismounting and removal from the ship; fix pitch propeller dismounting; thruster (nozzle and lower transmission box) removal; transportation of all these components to our workshops, where they were completely disassembled, inspected and calibrated; roller bearings renewal; new propeller blue fit test; final workshop assembling; transportation of all the components to the ship, manoeuvering and definitive mounting.
- "ECHIZEN MARU". Conversion of all the main deck fishing equipment, including: to remove all existing equipment; to build the new generator room and the electric panel room for the new equipment; to extend life-boat deck; to modify accommodation (cabins, toilettes, staircases) and bridge; to close main deck passages in way of accommodation both sides and install rails for the fishing manoeuvring on such deck; to extend stern platform and fabricate and install on it, new fishing door structures and supports; to fabricate and install on the main and life boat decks and on the stern platform, the bases of 22 new winches; to install such winches; to install the new generator, including the fabrication and mounting of all the pipes and tanks associated with. The weight of the new naval steel constructions was 70 tons.
- "FLUMAR ARATU". Overhauling of the main engine reduction box and clutch, including: complete disassembling; inspection and calibration of their parts; "in situ" machining and bushing of rolling bearing housings; rolling bearings, shafts, gears and clutch discs renewal; final assembling.
-
"GSI ADMIRAL". Renewal of the complete set of seismic cable
winches and reels (4 units of 5 meters diameter and 17,5 tons
weight each), including: a) Cropping off and transient removal
of upper and helicopter deck areas, in order to allow the removal
of the existing four seismic cable winches and reels; b) Cropping
off and removal of the existing four seismic cable winches and
reels and their foundations; c) Fabrication and installation
of foundations and reinforcement structures for the new four
seismic cable winches and reels; d) Reception of the parts of
the new four seismic cable winches and reels; assembling of
such winches and reels on the pier; manoeuvring, installation,
alignment and starting up of them on the ship; e) Final installation
of transitorily removed areas of upper and helicopter decks.
- "TAI AN". Partial
renewal of propulsion and steering systems (propeller, nozzle
and rudder), including: a) Removal of propeller shaft and propeller;
reception of new propeller, machining of its central conic bore,
conic milling of its keyway and blue test fitting of its conic
bore on the propeller shaft cone; installation of propeller shaft
and hydraulic assembling of propeller; b) Reception of the nozzle;
fabrication and installation of the steel structure required for
its entailment with the hull and the stern post; installation,
alignment and welding of the nozzle, with continuous control of
propulsion and rudder system lines; c) Removal of rudder and rudder
stock; fabrication and installation of "tail fish" and new steel
plates on upper and lower rudder areas; final assembling of rudder
stock and rudder.
- "ALIANÇA
ANDES". Complete renewal of wave breaking bulkhead (24 x 6
meters gross dimensions and 24 tons weight), including: a) Complete
removal of damaged wave breaking bulkhead, including supporting
structures, hold accesses, ventilation ducts and electric panels;
b) Complete removal of mast and lightning fixtures; c) Fabrication
and installation of new wave breaking bulkhead; d) Fabrication
of a new mast section, assembling of such section with the existing
section and installation of complete mast; e) Reparation and/or
fabrication and assembling of the others removed elements.
- Rudder and
rudder stock repair of norwegian tanker ship "CHAMPION ARTIC".
The damage to be repaired was the separation -during navigation-
of the rudder upper casting -where the rudder stock is coupled-
from the rest of the rudder. In these conditions, the upper casting
remained coupled to the rudder stock, and the rudder got free,
without any possibility of moving, only related with the ship
by the pintle located in its horn housing, and laying on it.
The repair -performed with the ship afloat- was, mainly, as
follows: disassemble the rudder (42 tons), the upper casting
and the rudder stock (13 tons); renew the rudder naval steel
plates (Grade E) affected by the damage; build up by electric
welding the inside cone of upper casting and locate it at its
original position in the rudder; perform the welding keeping
a sharp alignment control, doing X rays tests and 100% ultrasonic
test; machine such inside cone and its two keyways; perform
its fitting with the rudder stock lower cone. While this was
done at the workshop, in the ship the jobs were: remove rudder
stock neck and pintle bronze bushes; machine "in situ" their
housings; install new bushes fabricated at the workshop. Finally,
the rudder stock and the rudder were assembled in the ship,
with the owner and Classification Society total approval and
satisfaction.
- Since 2002 the company has successfully participated in the
demanding repair market of container
ships belonging to German owners. Up to now, more than 40
ships of this type have been repaired both in our shipyard and
in the Montevideo harbour piers.
- The company has lately broken into two new markets: research
ships, of which we have repaired the "GSI ADMIRAL" and the "LAURENTIAN",
both dedicated to the detection of submarine petroleum deposits;
and the ferrys that attend the Buenos Aires-Colonia and Buenos
Aires-Montevideo lines, of which we have repaired the "ATLANTIC
III" and the "ALBAYCIN".
- Complete manufacturing of fishing vessel "GRAMPIAN
FURY" rudder-nozzle, including: shaping, assembling and steel
welding; machining of coupling flange and pintle conical housing;
drilling of coupling flange calibrated holes; pintle fitting inside
its conical housing.
- Main engine complete overhauling of "KENT
TRADER", including: a) disassembling, cleaning, inspection,
calibration and assembling of cylinder heads, pistons, connecting
rods, connecting rods bearings, main bearings and turbochargers;
b) original crankshaft disassembling and assembling of a new crankshaft
supplied by the Owner.
- Removing from the ship, placing on ground over suitable supports,
grit blasting and painting of special rubber seal housings, renewing
such special seals and performing miscellaneous steel renewal
jobs, to the 19 hatch covers (12,5 m x 10,3 m, 28 ton each) belonging
to the "MERCOSUL
PESCADA" (German container ship).
- Renewal of 80 tons. of naval steel plate belonging to hold bulkheads
and hatch covers, of the open hatch bulk carrier "PIPIT ARROW"
(ex "TOKI"), simultaneously with the surface treatment of 14,000
m2 of hold surfaces –gritblasting to SA 2 ½ and application
of two coats-.
- Renewal of 100 tons of naval steel plate belonging to the double
bottom tank ceiling and its associated internal structure, of
fuel tanker "ALIA".
- Disassembly and assembly of starboard side rudder blade and
tailshaft of cruiser "EXPLORER
II" , for white metal rebabbiting of both stern tube bearings:
a) partially, the fore located bearing, aprox. 460 mm inside diameter
and 500 mm length; b) totally, the after located bearing, aprox.
460 mm inside diameter and 1,200 mm lenght.
- Complete repair of stern area of bulk carrier "ONEIDA"
affected by its main engine exhaust gases boiler explosion, including:
A) complete fabrication and assembly of: main engine, auxiliary
engine, main engine exhaust gases boiler and incinerator exhaust
pipes; water pipes; thermal insulation; ventilation ducts and
intake pieces; provision cranes; B) assembly of new main engine
exhaust gases boiler; C) renewal of steel plate and associated
structure in accommodation and stern decks; D) complete rearrangement
of accommodation, corridors, dining room, and others areas: bulkheads,
panels, floors, ceilings, doors, lighting fixtures; E) main and
auxiliary engines maintenance.
- Renewal of 200 tons. of naval steel plate and associated internal
structure belonging to cargo tanks of chemical tanker "ANTARES
I" , including: cropping off of damaged steel plates, construction
of templates for shaped steel naval plate fabrication, making
of specific repair drawings, fabrication of shaped steel naval
plate with single and double curvature, assembling of plane and
shaped steel naval plate, final welding, X rays testing, final
approval.
- Renewal of 80 tons. of special naval steel internal structure
belonging to the wing ballast tanks, of the bulk carrier "NEWCASTLE
CITY".
- Complete repair of rudder system, including: alignment checking
and resultant "in situ" machining of hull; rudder blade and rudder
stock liners renewal; cones rebuilding, machining and fitting
in rudder stocks, pintles and rudder blades; steering gear overhauling;
final assembling; of the following M/V vessels: "SEA EXPRESS",
"PRESIDENTE ARTURO ILLA" (YPF tanker), "GIANNIS
NK" , "GOLD ROVER" (British Navy), "TOBA PEGASO", "NILZA"
(PETROBRAS tanker), "CAMINO", "ESTRELLA ATLANTICA" (SHELL tanker),
"CHARMYL", "SAGA
TUCANO" (Hongkonish open hatch bulk carrier built in 1997),
"MAERSK ROSARIO"
(German container ship).
- Dry docking of "PROLIV
NEDEZDHY" -for a no permanent repair that allows her to recover
her navigability- that had experienced an important damage of
bottom steel plate hull, in way of double bottom tanks that were
full of oil. Several actions were taken in order to prevent an
eventual oil spillage during docking manoeuvre.
- Afloat renewal of tailshaft outside seal, of "ROSS SEA", including
disassembly and assembly of propeller, 20 tons weight.
- Partial tank coating -grit blasting SA 2 ½ and one or
three coats (depending on the paint schedule applied)- performed
on approximately 7,000 square meters for each ship, in the following
light fuel tankers owned by PETROBRAS: "NILZA"
, "NORMA", "DIVA", "NARA", "LAMBARI", and "LIVRAMENTO".
- Repair of rudder blade (aprox. 7,500 mm. x 3,500 mm. 20 tons.
weight), including: dismantling; alignment control; preparation
to avoid distortion during cropping off and welding; cropping
off of cracked areas on pintle cone end cast steel housing and
nearby plating; installing and welding of required new naval steel
plating, applying suitable heat treatment and checking alignment
distortion during welding; X rays tests and ultrasonic tests on
welds; final straightening process in order to improve remaining
misalignment, by heat and hydraulic force suitable application;
fitting improvement of pintle tapered end in its housing, with
required number of blue tests included; final assembling on ship,
of M/V "MSC ARGENTINA" (German container ship), M/V "LAMBARI"
(PETROBRAS tanker), M/V
"CASTILLO DE GUADALUPE" (Spanish general cargo,
previously owned by DOCENAVE).
- "NORDAMERIKA"
(Danish chemical tanker built in the year 2000)
Steering System
Hydraulic disassembly of: rudder, steering gear and rudder
stock, and transport them to the Workshop
Draw rudder line, through their upper and lower cones. Machine
“in situ” its lower casting, fabricate cylindrical-conical
insert and installe it in such casting. Make pintle fitting
in its lower casting conical housing and rudder stock fitting
in its upper casting conical housing, by the required number
of blue tests.
Place the new rudder stock, supplied by the owner, on the lathe;
machine its area in way of its bearing located in the rudder
horn. Fit its lower cone in the rudder and its upper cone in
the steering gear, by the required number of blue tests.
Remove the seriously damaged existing rudder horn; clean and
chamfer carefully all hull plates edges related with rudder
horn; install new rudder horn, align it and weld it to the corresponding
hull plates, by X rays controlled welding; draw final rudder
system line and machine "in situ" both horn bush
housings: the upper for the rudder stock and the lower for the
pintle; fabricate and install such bushes in their respective
housings.
Renew steel plates of the steering gear room floor and its
associated structure, including the base of the steering gear,
in way of such equipment.
Transport the rudder to the ship and manoeuvre it to its position.
Transport the rudder stock to the ship, monoeuvre it to its
position and assemble it hydraulically to the rudder. Transport
the steering gear to the ship, monoeuvre it to its position
and assemble it hydraulically to the rudder stock.
Verify the actual clearance between each steering gear support
and its base; consequently, fabricate one steel chock for each
support, fit them one by one "in situ" to each support
and drill them, supplying the corresponding fixing bolts.
Propulsion System
Hydraulic disassembly the propeller: four blades, diameter
6,150 mts, weight 15 tons, and transport it to the Worshop.
Straighten three of its four blades, which presented initial
axial deformations up to 720 mm, by fabrication of specific
tools and thermo-mechanic special treatments. Perform final
pitch control.
Disassemble propeller shaft from intermediate shaft; perform
opening on the hull in way of engine room, in order to allow
removal of such shaft to the Workshop. Once in the Workshop,
present the propeller shaft on the lathe, to check its alignment.
Transport propeller and propeller shaft to the Dock. Perform
on the dock platform, in vertical postion, the fitting of the
propeller shaft stern cone in the propeller cone, by the required
number of blue tests.
Introduce the propeller shaft in the engine room, manoeuvre
it to its position and assemble it with the intermediate shaft;
blank and weld the hull opening.
Manoeuvre the propeller to its position and assemble it hydraulically
to the propeller shaft.
- Works in main and auxiliary diesel engines (Sulzer, MAN B&W,
Pielstick, Mitsubishi, Cummins), including: partial or complete
units overhauling, crankshaft substitution, parts repair, complete
assembly.
- Renewal of 70 tons. of naval steel plate belonging to fore peak,
chain lockers and hold Nº 1, of the bulk carrier "VALY",
including: cropping off of damaged steel plates, construction
of templates for shaped steel naval plate fabrication, making
of specific repair drawings, fabrication of shaped steel naval
plate with single and double curvature, assembling of plane and
shaped steel naval plate, final welding, X rays testing, final
approval.
- Complete repair of rudder system, with same description as "SAGA
TUCANO", but including in this case: straightening and stress
relief of bent rudder stock (360 mm. diameter with eccentric flange,
6,000 mm. length, 8 tons. weight), of M/V "GEMARELLA"
.
- Construction of a "micro" floating dock to perform afloat inspections
of rudder systems of oil tankers "PALM
BEACH" and "BAYWAY", owned by ESSO Argentina.
- Inspection and repair of lower pintle and skeg bush, of oil
tanker "PALM BEACH", using such "micro" floating dock.
- Complete tank coating of cargo tanks -grit blasting SA 2 ½
and one or three coats (depending on the paint schedule applied)-
performed on 21,500 square meters for each ship, in the following
light fuel tankers owned by PETROBRAS: "MARTA", "NORMA"
y "DILYA" .
- Renewal of 690 tons. of naval steel plate and associated internal
structure, belonging to flat and vertical bottom of the bulk carrier
"ADAMASTOS", including: a) cropping off of damaged steel plates,
construction of templates for shaped steel naval plate fabrication,
making of specific repair drawings, fabrication of shaped steel
naval plate with single and double curvature, assembling of plane
and shaped steel naval plate, final welding, X rays testing, final
approval; b) renewal of all the ballast pipes in way of the damaged
double bottom tanks; c) alignment control of propulsion and steering
systems.
- Complete repair of rudder system of M/V "ZONDA
I", performed afloat, using a watertight box.
- Afloat joining of two parts of existing floating dock of Tsakos
Industrias Navales S.A., including all works related with welding,
piping, valves, electricity, launching and cranes.
- Afloat repair of floating crane "TENIENTE
DEL CASTILLO", owned by Ecogesa (Hotchief), including complete
disassembling and assembling of jib, tower and side supports,
with difficult manoeuvring performed at 40 mts. height.
|
|
 |
| |
|
| |
|
| |
|
| |
|
| |

The "Antartic Sea" afloat, aside our floating dock north side, when the conversion job had just started.
|

The "TSHD Reynaert" dredge in
our floating dock.
|

The "Hang Jun 3001" dredge in
our floating dock.
|

"HANG JUN 4011" - One elbow of the dredging piping, fabricated in the workshop, during its welding process.
|
 |
| |
"SKANDI PATAGONIA" - The ship inside our floating dock.
|
|
| |
|
| |
 |
| |
"ECHIZEN MARU" - Rudder stock sleeves rectifying.
|
|
| |
|
| |

"TAI AN" - The ship in the floating dock.
|

"ALIANÇA ANDES" Removal monoeuvering of the damaged breakingwave bulkhead.
|

Rudder and rudder stock repair of norwegian tanker
ship "CHAMPION ARTIC"
|
 |
| |
"LIBRA NEW YORK": German container ship in our Floating
Dock.
|
|
| |
 |
| |
"ATLANTIC III": The ship in our Floating Dock.
|
|
| |
 |
| |
"GRAMPIAN FURY": Both rudder-nozzles in our Workshop:
the new manufactured one and the old damaged one.
|
|
| |
 |
| |
M/V "ONEIDA" - The damaged vessel, sailing to the
shipyard.
The chimney had completly disappeared.
|
|
| |
 |
| |
M/V "ANTARES" - The collided ship, presenting a damage
of approximately 40 meters by 12 meters. The hull
plate was cut and folded as a bellows, towards the
damage stern area.
|
|
| |
 |
| |
M/V "SAGA TUCANO" - General overview of the afloat
rudder blade
disassembling jobs, alongside the floating dock.
|
|
| |
 |
| |
Built up by electric welding of the lower cone of
the "GIANNIS NK" rudder stock
|
|
| |
 |
| |
The "NILZA" in the floating dock, ready for undocking.
|
|
| |
 |
| |
Hull treatment of "NORMA" in the floating dock
|
|
| |
 |
| |
M/V "CASTILLO DE GUADALUPE"
The rudder blade in the ship inside the floating dock,
completly assembled and painted.
|
|
| |
 |
| |
M/V "NORDAMERIKA" - The ship stern area, just before
the ship undocking.
|
|
| |
 |
| |
Bow repairs of "VALY" during its final stage
|
|
| |
 |
| |
The microdock installed on the "PALM BEACH" stern
area.
|
|
| |
 |
| |
Afloat repairs of the crane "TENIENTE DEL CASTILLO"
|
|
| |
|
| |
|
| |
|
|
|
|
|